Protection Box of Power Transformer 65 MVA – Substation 132 KV

MEP-Projects developed the electrical diagrams of the transformer protection panel of the 20 megawatt wind farm substation project in Huesca (Spain). Made with the leading software in electrical projects, EPLAN P8, these schemes define the detailed engineering of all the elements that make up the protection and control panel of the transformer of the substation, equipment, connections, switchgear …

Picture 1- Tensions formation box
Picture 2 - RPM intensity training box
Picture 3 - Protection Panel. UCP