Renovation of the equipment and electrical building of the International Airport of Goma (Congo)

MEP-Projects carried out the electrical equipment engineering design for the power center and renovation of its building at GOMA International Airport.

Picture 1
Picture 2

Pictures 3 and 4 – Illumination Calculation.

Picture 5 - calculation of the lightning conductor with its action diameter and coverage cone