HVAC Project for Hospital (Belgium)

Our company, MEP-Projects, has developed a large part of the HVAC project for an University Hospital in Belgium, with a total of 9 plants. For this project, the following documentation was generated:

  • Electrical design criteria and electrical architecture.
  • Control design criteria and control architecture.
  •  Lists of technical documentation (datasheets).
  • Plans for the location of electrical and control panels.
  • Listings:
    • List of charges.
    • List of wired signals.
    • List of signals communicated.
    • List of equipment measurements of the HVAC system.
    • List of communications links.
  • Technical specifications of electrical and control panels.
  • Single-line diagrams.
  • Air trays.
    • Calculation of sizing of trays.
    • Plans of aerial trays.
    • List of measurements to purchase aerial trays.
  • Wiring.
    • Calculation of low voltage cables.
    • Listings of electrical cable routings.
    • List of measurements for the purchase of low voltage cables.
    • Selection list of instrumentation and control cables (with datasheets).
    • List of routing of instrumentation and control cables.
    • List of measurements for the purchase of instrumentation and control cables.
  • Typical plans of terminal boxes.
  • Typical assembly plans.